The pilot plant
- The pilot plant bridges laboratory development and full production, typically at about 10% of commercial batch size.
- Objectives: test the formula and process on production-type equipment, identify critical process parameters, produce clinical and stability batches, and write master manufacturing instructions.
- Its staff need knowledge of both formulation and engineering, and it needs space, utilities and GMP documentation.
- SUPAC (scale-up and post-approval changes) guidance classifies changes by level and the data needed to support them.